Contact us now for more information.
Armellini Logistics
Palm City, FL
Re-roof of Environmentally Controlled Floral Shipping Building, Maintenance Building, Support Buildings, and Office Complex Building. Utilized Inland Buildings Pre-engineered Retrofit Roof Framing System at Environmentally Controlled Floral Shipping Building including Inland Buildings Standing Seam Galvalume Roof Panels, Inland Buildings Color Coated R-Panel Sidewall Panels, Operable Roof Vents, Insulated Skylights, Gutters, Downspouts, and associated Trim, Bay Insulation of Florida Fiberglass Vinyl-backed Roof and Wall Insulation, sprayed Fire-retardant Insulation on all Primary and Secondary Framing Members, constructed and finished Dispatch Office Building within structure, interior Concrete Slab replacement, finished all of concrete floor with non-slip sealant, Loading Dock Platforms, Coiling Roll Up Overhead Doors, HVAC, Humidity Control Units, Electrical, Fire & Security Alarm System, Data System, and Fire Suppression System. Installed Inland Buildings Pre-engineered Retrofit Roof Framing System at Maintenance and Support Buildings including Inland Buildings Standing Seam Roof Panels, Operable Roof Vents, Insulated Skylights, Gutters, Downspouts, related Trim, and Sectional Overhead Doors. Water and Wind Mitigation and reconstruction of Office Complex Building including Inland Building Standing Seam Roof Panels, Gutters and Downspouts, and interior finishes. Parking Lot repair and re-striping, Landscaping.
Disney Dixie Landings Resort Support Facility
Orlando, FL
Supplied and erected to Disney World 3 ea. Inland Buildings Pre-engineered Metal Buildings totaling over 25,000 S.F. and included Primary, Secondary, and related Structural Framing Members, Inland Buildings Galvalume Standing Seam Roof Panels, Inland Buildings R-Panel Kynar Coated Wall Panels, Inland Buildings Kynar Finished Flat Soffit Panels, Operable Roof Vents, Insulated Skylights, Gutters, Downspouts, and related Trim, Owens-Corning Vinyl-Backed Fiberglass Roll-runner Roof Insulation system, and Owen-Corning Vinyl-Backed Fiberglass Wall Insulation, and Coiling Roll Up Doors.
Taylor County Public Works Office Building
Perry, FL
Performed required Site Work, excavated Footings and Column Pier Pads, built Building Pad as directed by County Engineer. Placed and finished Reinforced Concrete Footing, Pier Pads, and Finished 3,000psi Fiber-mesh reinforced Slab-on-grade.Concrete Floor with Control Joints. Supplied and erected an Inland Buildings Pre-engineered Metal Building including R-Panel Galvalume Roof Panels with Gutters, Downspouts, and related Trim, Inland Buildings Color Coated R-Panel Wall Panels with related Trim, Inland Buildings Canopy System, Bay Insulation of Florida Vinyl-backed Fiberglass Roof Insulation, Installed Interior Wall Framing and Orange-Peel Painted 5/8″ Gypsum Wall Board, Acoustical Ceiling System with R-19 Fiberglass Insulation above, Cabinetry and Countertops, Restroom Specialties and Accessories, Insulated Fixed Glass Windows with Bronze Aluminum Frames, Hollow Metal Doors and Frames, Door Hardware including Locksets, Door Closers, and Panic Hardware, Painting, Floor Coverings including “Click-Lock” Vinyl Flooring and Base, Sherwin-Williams HB-150 finish in Break Room , Life Safety fixtures, HVAC, Plumbing, and Electrical.
Brevard County School Board
Brevard County, FL
Supplied and erected 8-Building Elementary School project for Discovery, Enterprise,Challenger, and Atlantis Elementary Schools using Inland Buildings Primary, Secondary, and related Structural Framing Members, IPS Kynar Finished Standing Seam Insulated Roof Panels, ECI Kynar Finished Fascia, Soffit Panels, and Gutters, Downspouts, and related Trim, Owens-Corning Roll-Runner installed Vinyl-backed Fiberglass Roof Insulation, Owens-Corning Wall Insulation. Buildings utilized Reinforced Concrete Footing, Pier Pads, and Finished Floor Slabs, CMU Wall with Brick Veneer connected to Inland Buildings Framing System. Each school approximately 100,000 S.F.
Odyssey Science Center
Leon County School Board, Tallahassee, FL
3-Storey Science Center for the Leon County School Board utilizing Reinforced Concrete Footings, Piers, and Retaining Walls, Structural Steel and Reinforced CMU Exterior Wall Framing with EFS covered Insulated Exterior Wall Finish, Metal Framed Interior Walls with Finished Gypsum Drywall, Painting, Steel Staircase, Light-weight Concrete Floor System, Floor Coverings, Cabinetry, Restroom Accessories, Hollow Metal Doors, Frames and Door hardware, insulated Acoustical Ceilings, HVAC, Plumbing, Electrical, Fire and Security Alarm System, Data, Fire Suppression System, exterior Concrete Walks, Slabs, and Stairs, Sitework, Landscaping and Irrigation System, Signage.
Play Time Learning Academy
Tampa, FL
8,500 S.F. Pre-K through Kindergarten Learning Center including Sitework, Underground Utilities, Stormwater Drainage System with Retention, Fire Line and Fire Hydrant. Excavated for footings, Column Pier Pads Structural Framing, recessed Slabs and Equipment Pads. Placed and finished Reinforced Footings, Column Pier Pads, Steps, Sidewalks, Curbs and Gutters, Equipment Pads, and Light-weight second floor Deck. Utilized Inland Buildings Pre-engineered Metal Building Columns, Beams, Bar Joists and Decking for Second Floor framing, Main Frames, Roof Purlins, and Inland Building SS-20 Standing Seam Galvalume Roof Panels. Insulated roof with Bay Insulation of Florida Fiberglass Vinyl-backed R-19 Insulation with Thermal Blocks. Placed reinforced Concrete Masonry Block Walls and Structural Metal Stud Framing with Painted Insulated Synthetic Stucco Finish. Supplied and installed Interior Metal Framed Walls with Gypsum Wall Board and Kraft-backed Fiberglass Insulation, Hollow Metal Doors and Frames with related Hardware, Paint finished walls, Door, and Frames, Ceramic Tile and Carpeted Flooring, Restroom Accessories, Cabinetry and Countertops, Fire Suppression System, Fire Alarm System, Security System, Data System, Plumbing, Electrical, and HVAC Systems, Steel Stair System with Person Lift, Landscaping and Irrigation System.
Cape Canaveral NASA Maintenance Building
Cape Canaveral, FL
Maintenance Building utilizing Inland Buildings Pre-Engineered Metal Building consisting of Galvanized Coated Main and Secondary Framing Components, Inland Buildings R-Panel Galvalume Roof Panels, and Inland Buildings Kynar Coated Sidewall Panels. This building was the first Inland Buildings had utilized Galvanized Coated materials. Other work included Sitework; Reinforced Concrete Footings, Piers, and Slab-on-grade; Electrical, Plumbing, and HVAC, Finish Grading, and Landscaping.
Pasco County School Board
Pasco County, FL
Covered Play Areas for five Elementary Schools utilizing Inland Buildings Pre-Engineered Metal Buildings Framing System, Inland Buildings R-Panel Roof Panels and Skirting Panels. Other work included Sitework, Reinforced Concrete Footing, Piers, and Slab-on-Grade, Finish Grading and Landscaping.
Orange County Detention Center
Orlando, FL
Maintenance Building with Inland Buildings Pre-Engineered Metal Building Components including Main and Secondary Framing Members, Standing Seam Galvalume Roof Panels, and Kynar Finished Wall Panels, Bay Insulation of Florida Roof and Wall Insulation. Other work included Sitework, Underground Utilities, Concrete Reinforced Footing, Piers, and Slab-on-Grade, Interior Build-out, Plumbing, HVAC, and Electrical installations, Fire and Security Systems installations, Landscaping and Irrigation.
Duval County Jail
Jacksonville, FL
Security Building for the Duval County Jail including Structural Steel Framing Members, Roof and Wall Panels, and Bay Insulation Roof and Wall Insulation.
Copper Moon Coffee
Indianapolis International Airport
Tenant space build-out in the Indianapolis International Airport including Metal Stud Framing, Fire-Retardant Drywall Systems, Wall Finishes, Metal Doors and Frames, Fixtures, Counters and Cabinetry, Tables and Chairs, Refrigeration Equipment, Storage, Plumbing, HVAC, Electrical, Security and Fire Alarm Systems, Wet Fire Suppression System, and Roll-up Grill. All work accomplished from 9:00 pm to 6:00 am.
Evian Paul
Indianapolis International Airport
Tenant Space build-out of Jewelry and Accessories store in the Indianapolis International Airport. Work included saw-cutting of Concrete Floor for additional Plumbing and Electrical Lines, re-pour of Trenches in Concrete Floor, Metal Stud Framing, Fire Retardant Gypsum Walls, Fire Insulation and Caulking, Walk-in Safe, Floor and Wall Coverings, Display and Counters, Plumbing, HVAC, Electrical, Security, and Fire Systems, Fro-Finished Walls, and Roll-up Security Grill. Dust and Traffic Control Barriers. All work completed between 9:00 pm and 6:00 am daily. Security Guards and supervised material deliveries.
Silver Star Commerce Center
Orlando, FL
35,000sf. Commerce Center Pier Pads, Split-faced CMU and Concrete in-fill at walls, Storefront Systems, Overhead Coiling Doors, Plumbing, HVAC, Electrical, Security System, Fire Suppression, Fire Alarm System, Signage, Parking Lot and Driveways, and Tenant Build-outs.
Eatonville Commerce Center
Eatonville, FL
45,000sf. Commerce Center utilizing an Inland Buildings Clear-span Structural system with Inland Building SS24 Galvalume Standing Seam Roof Panels, Concrete Slab-on-Grade with Footings and Pier Pads, Split-faced CMU and Concrete in-fill at walls, Storefront Systems, Overhead Coiling Doors, Plumbing, HVAC, Electrical, Security System, Fire Suppression, Fire Alarm System, Signage, Parking Lot and Driveways, and Tenant Build-outs.
Phifer Industries/Eric Adams Office Building
Orlando, FL
7,500sf 2-Storey Office Building with Concrete Footings, Slab-on-Grade, and Stairs; Masonry Exterior Walls with EFS Stucco and Insulation System; Steel Stud Interior Walls with finished Gysum Board and Paint Finish, Store Fronting, Floor Coverings, Restroom Accessories, Plumbing, HVAC, Electrical, Data and Telephone, Fire Suppression, Fire And Security Alarms, Parking Lot and Driveways, and Signage.
Imperial Oaks Apartment Complex
Pulaski, TN
240,000sf Apartment Complex consisting of multiple 2-storey buildings and 5,000sf Office/Exercise Building. Concrete, Footings and Slab-on-Grade, Wood Framed Exterior Structural Walls, Wood Framed Interior Walls, Gypsun Wallboard, Paint, Wall and Floor Tile, Floor Coverings, Appliances, Bathroom Accessories, Steel and Concrete Stairs, Plumbing, HVAC, Electrical, Fire Alarm System, Fire Suppression, Parking Lot, Driveways, Streets, Landscaping, Irrigation, Signage, Fencing, Swimming Pool, and Exercise Equipment.?
Eden
Tampa, FL
Construction Manager for RCT to construct a 10,600sf Night Club with 15,000sf outside Bar and meeting area located in the heart of downtown Tampa. Work included restoration of an existing 100-year old building, including bringing the structure into compliance with existing governing building codes and to insure structural integerity of the structure. Additional work included demolition of the existing interior and outside patio area, relocation of utilities, saw-cutting of concrete floor for additional utilities and service items, construction of new metal framed Interior Walls with required blocking for the attachment of wall hung accessories and cabinetry, Stiffening of 2nd floor joists to insure these members could carry additional live and dead loads, exterior and interior wall insulation and sound suppression systems, construction of bar areas with related beer and soda delivery systems, platforms for booths, hang, tape, and finish gypsum wallboard systems, hollow metal and wood doors with metal door frames, door hardware and exit systems, restroom fixtures and accessories, electrical, HVAC systems, life safety, fire suppresion system, alarm system, floor coverings, exterior and interior signage, painting, lattice work with floral finishes, wall coverings, tile wall systems, elevator, stairs, pavers, lighting, ornamental gates and fencing, and sound system.
River City Nature Park Restroom Facility
DeBary, FL
Pre-Fabricated Concrete Structure conataining Restrooms and Mechanical Room for the City of DeBary River City Nature Park and included sitework, clearing and grubbing, running 2' Water Line from street to restroom structure, septic tanl, drainfield, and lift station, restroom fixtures and accessories, drinking fountain, concret side walks, signage, back-flow preventer, water meter, and painting.
City of DeLand Maintenance Building #5
DeLand, FL
Pre-engineered Metal Building including Soils Investigation, Site Work, Construct Building Pad, Excavate Footings and Pier Pads, form Slab-on-Grade, set Anchor Bolts, install Reinforcing Steel, Pre-treatment, place and finish 5" deep Fiber-Reinforced Concrete, place 3/4" deep Expansion Joints, seal Concrete Slab.
Copyright © 2024 Phifer Industries Inc. - All Rights Reserved.
Phifer industries inc. is a faith based organization
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.